<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Journal Publishing DTD v1.3 20210610//EN" "JATS-journalpublishing1-3.dtd">
<article xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:mml="http://www.w3.org/1998/Math/MathML" dtd-version="1.3" article-type="research-article" xml:lang="en">
  <front>
    <journal-meta>
      <journal-title-group><journal-title>SET Proceedings</journal-title></journal-title-group>
      <issn pub-type="epub">2978-4387</issn>
      <publisher><publisher-name>Caravel Press</publisher-name></publisher>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="doi">10.65582/set.2008.296</article-id>
      <article-id pub-id-type="publisher-id">2008.296</article-id>
      <title-group><article-title>The Process Modeling for Feasibility study of Mixed-use Development by IDEF0</article-title></title-group>
    <contrib-group>
      <contrib contrib-type="author">
        <name><surname>Yu</surname><given-names>Chang-Gyu</given-names></name>
        <xref ref-type="aff" rid="aff1"/>
        <email>ynfun@hotmail.com</email>
      </contrib>
      <contrib contrib-type="author">
        <name><surname>Lee</surname><given-names>Joo-Sung</given-names></name>
        <xref ref-type="aff" rid="aff1"/>
        <email>neowings@naver.com</email>
      </contrib>
      <contrib contrib-type="author">
        <name><surname>Lee</surname><given-names>Yoon-Sun</given-names></name>
        <xref ref-type="aff" rid="aff1"/>
        <email>yoonsunlee@korea.com</email>
      </contrib>
      <contrib contrib-type="author" corresp="yes">
        <name><surname>Kim</surname><given-names>Jae-Jun</given-names></name>
        <xref ref-type="aff" rid="aff1"/>
        <email>jjkim0205@hotmail.com</email>
      </contrib>
      <aff id="aff1">Dept. of Sustainable Architectural Engineering, Hanyang University, Seoul, Korea, 133-791</aff>
    </contrib-group>
      <pub-date publication-format="electronic" date-type="pub"><day>24</day><month>08</month><year>2008</year></pub-date>
      <volume>7</volume>
      <issue>1</issue>
      <isbn publication-format="electronic">978-1-995850-08-5</isbn>
      <fpage>2107</fpage>
      <lpage>2111</lpage>
      <self-uri xlink:href="https://caravelpress.com/proceedings/set/papers/2008.296"/>
      <history>
        <date date-type="received"><string-date>24 August 2008</string-date></date>
      </history>
      <permissions>
        <copyright-statement>© 2008 Copyright WSSET</copyright-statement>
        <copyright-year>2008</copyright-year>
      </permissions>
      <abstract><p>The construction industry, as a industry of many influence in national business cycle, is changing into multiplicity, distinction and sophisticated system. It is demanded that construction instruction industry is changed to an aggressive and active development type from an order dependence type through the real estate policy on August 31 2005 and real estimate speculation regulation policy etc. The building construction has a process from planning to maintenance by designers, builders and developers. Therefore owners are trying to gain expense effect for a process of the public building construction. The business and sales facility construction is consist of the passive order system in response to owner’s requests. As a result, it has incurred a great loss in development due to instinctive decision and a limited sense in economic side. This study is aimed at a process modelling to decide whether it is development of building through a process model included location, market analysis and feasibility study in the planning phase.</p></abstract>
      <kwd-group kwd-group-type="author">
        <kwd>IDEF0 method</kwd>
        <kwd>Feasibility study</kwd>
        <kwd>MXD (Mixed-use Development)</kwd>
        <kwd>Location analysis</kwd>
        <kwd>Market analysis</kwd>
        <kwd>Sustainability</kwd>
      </kwd-group>
      <conference>
        <conf-date>24 to 27 August 2008</conf-date>
        <conf-name>7th International Conference on Sustainable Energy Technologies</conf-name>
        <conf-acronym>SET2008</conf-acronym>
        <conf-num>7</conf-num>
        <conf-loc>Seoul, Korea</conf-loc>
      </conference>
    </article-meta>
  </front>
  <body>
  </body>
  <back>
    <ref-list>
      <ref id="ref-r1">
        <mixed-citation publication-type="journal">Shin Woo-Shik, Park, Keun-Joon (2004) The process Modelling for Feasibility Study of the Apartment Project by IDEF0, Architecture Institute of Korea.</mixed-citation>
      </ref>
      <ref id="ref-r2">
        <mixed-citation publication-type="journal">Jang Hye-jin, Kwon Ki-beom, Yun Seok-Heon, Peak Joon-Hong (2006) A main Factor on the process of appropriateness analysis for project development in order to activate commercial complex facilities – Aiming the special plan zone analysis of trade center, Architecture Institute of Korea.</mixed-citation>
      </ref>
      <ref id="ref-r3">
        <mixed-citation publication-type="journal">Kim Kyoung-sik, Park Jong-soon, Lee Kyung-Kook, Chun Jae-Youl (2005) Business process analysis of social overhead capital for construction project, Architecture Institute of Korea.</mixed-citation>
      </ref>
      <ref id="ref-r4">
        <mixed-citation publication-type="journal">No byung-ok, Lee sang-beom, leem nam-ki A study on the feasibility study process model about location &amp; analysis in the planning phase – business &amp; Sale Institute Project.</mixed-citation>
      </ref>
    </ref-list>
  </back>
</article>
