Skip to content
Caravel Press

Conference paper

Numerical simulation and optimization design for ceiling supply air of an underground main workshop in hydropower station

, ,

1College of Applied technology Chongqing University, Chongqing 400030, P.R.China

Published
24 October 2003
Pages
291-296
DOI
10.65582/set.2003.065
Access
Open access, © 2003 Copyright WSSET
Download PDF6 pages · 5.5 MB

Abstract

The indoor air distribution of an underground main workshop in hydropower station with different number, location and size of inlets and velocity of supply air were simulated by using the way of computational fluid dynamics (CFD). The air velocity, temperature and their standard deviation of 18 kinds of supply air schemes in the occupied region of the main workshop were obtained. By comparing to these schemes, it is shown that the air distribution with 60 inlets of two lines of symmetry location and supplying velocity of 7.8 m/s is preferable. In addition, a reasonable design method is proposed according to the large volume of supply air and duct of cross-section size in the underground main workshop. Valuable scheme is given for ventilation and air conditioning design of the hydropower station in inviting bids stage.

Keywords. numerical simulation; air distribution; manifold duct; resistance calculation

How to cite this article

Zhang, H., Fu, X. and Ma, X. (2003). 'Numerical simulation and optimization design for ceiling supply air of an underground main workshop in hydropower station'. SET Proceedings, 2(1), pp. 291-296. https://doi.org/10.65582/set.2003.065

© 2003 Copyright WSSET

Free to read, download, print and share, unaltered and for non-commercial purposes, provided the authors, the paper and the proceedings are credited. Any other use, including commercial use or adaptation, needs written permission: write to [email protected].

← SET Proceedings