Skip to content
Caravel Press

Conference paper

Application of geothermal heat pumps in renovated campus building of Korea

,

1Department of Architectural Engineering, Cheong-Ju University, Cheong-Ju, Republic of Korea

2Department of Facilities in University, Cheong-Ju University, Cheong-Ju, Republic of Korea

Published
24 August 2008
Pages
1612-1619
Received
24 August 2008
DOI
10.65582/set.2008.224
Access
Open access, © 2008 Copyright WSSET
Download PDF8 pages · 534 KB

Abstract

Recently, geothermal heat pumps (GHPs), which are normally known as ground source heat pumps (GSHPs), offer some advantages for heating and cooling of residential and commercial buildings due to the higher energy efficiency compared with conventional EHP system. In Korea, the renewable energy sources are forced to apply to the public buildings, which have over 3,000 m² of floor area according to the law. While GHPs may be more costly to install initially than regular heat pumps, they can also produce markedly lower energy bills. For this reason, GHPs are scrutinized as the heating and cooling alternatives in renovation of the campus buildings in Korea. In this study, we would like to investigate the application methods of GHPs for renovation of campus building, and to compare the energy costs of GHPs with that of conventional system. Also, the objective of this study is to present an operation status of GSHPs in renovated campus building as an example.

Keywords. Geothermal heat pumps (GHPs); Campus building renovation; Energy bills

© 2008 Copyright WSSET

Free to read, download, print and share, unaltered and for non-commercial purposes, provided the authors, the paper and the proceedings are credited. Any other use, including commercial use or adaptation, needs written permission: write to [email protected].

← SET Proceedings