Skip to content
Caravel Press

Conference paper

Optimal Dimensioning of Low-Energy District Heating Networks with Operational Planning - Case Study for Existing Buildings

,

1Technical University of Denmark, DK-2800, Denmark

Published
2 September 2012
Pages
113-122
Received
2 September 2012
DOI
10.65582/set.2012.013
Access
Open access, © 2012 Copyright WSSET
Download PDF10 pages · 375 KB

Abstract

Low-temperature operation in low-energy District Heating (DH) systems is rewarding for increased exploitation of low-temperature renewable energy sources, heightened efficiency at heat extraction, and intensified energy efficiency at heat distribution. Success of heat delivery in low-temperature operation such as 55 °C in terms of supply and 25 °C in terms of return was achieved through real cases located at Lystrup in Denmark, and “Greenwatt Way” project located at Scotland in UK as demonstration of low-energy DH systems being considered to supply heat to new houses with low-energy class. In our former study the performance of in-house heating systems was investigated for changing levels of supply temperature with consideration given both to current high-heat demand and future low-heat demand value of an existing settlement. The over-dimensions obtained at in-house heating systems originally in design stage resulted in satisfaction of heat demand of the house in low temperature operation. In this paper the operational planning of the low-energy DH systems was investigated to reduce the dimensions of the distribution network with consideration given both to current high-heat and future low-heat demand situations. The operational planning was based on boosting (increasing) the supply temperature at peak-demand situations which occur rarely over a year period. Hence optimal pipe dimensions of low-energy DH systems were investigated based on the dynamic response of in-house heating systems with changing supply temperatures ranging between 55 – 95 °C. The boosting level of supply temperature was considered to be determined separately for current high and future low heat demand scenarios. As a conclusion it was found that 40% reduction in the pipe investment cost could be reached by use of operational planning in comparison to DH network dimensioned according to high heat demand situation.

© 2012 Copyright WSSET

Free to read, download, print and share, unaltered and for non-commercial purposes, provided the authors, the paper and the proceedings are credited. Any other use, including commercial use or adaptation, needs written permission: write to [email protected].

← SET Proceedings