In dual purpose power and water (DPPW) production plants two challeneges are often encountered; (a) maintaining operations that meet a desired water production/demand ratio or power production/demand ratio, and (b) meeting the desired water to power ratio. Although these problems are usually implied in the implemented plant design and technology, operational issues play an important role in fine tuning operations towards optimal performance. In addition, operational practices have a bearing on energy consumption and operating efficiencies. In this paper, a simulation based approach is used to provide data for handling the fine tuning of operations towards desired targets. To this end, numerical simulation is used to determine the relationships between total water/power demand and total water/power produced. In order to reduce the specific energy consumption of the plant, investigations on the design and operating features of the DPPW production plants were carried out. An existing DPPW production plant was used as a case study. The investigation proceeded by focusing on identifying the optimal production operation strategies that, if implemented, can reduce energy consumption in the production of water and power. Discrete event simulation was used to experiment with a number of feasible plant configurations and strategies for producing power and water. Water to power ratios were used to compare the effectiveness of the feasible production operation strategies through simulation experiments. For each configuration, average values of the simulated data (i.e. both water and power) were determined and used to calculate water to power ratios. Simulation results show that different plant configurations and different operational strategies and practices affect the water to power ratios. This allows engineers and operators to select plant configurations, operational strategies and practices that give them the desired water to power ratios with repect to demand scenarios. Therefore, simulation is an effective tool in identifying opportunities for tuning operations to meet desired production requirements.
References
Al-Mutaz , I. S. and A. M. Al-Namlah .2004. Characteristics of dual purpose MSF desalination plants.Desalination 166 : 287-294.
Altiok ,T. and B. Melamed. 2007.Simulation Modeling and Analysis with ARENA
Ferreira, E. M. , J. A. Balestieri and M. A. Zanardi .2010. Optimization analysis of dual-purpose systems. Desalination 250 : 936–944
Hamed , O. A. , G. M. Mustafa , K. Ba Mardouf and H. Al Washmi. 2001. Prospects Of Improving Energy Consumption Of The Multi-Stage Flash Distillation Process . Proceedings of the Fourth Annual Workshop on Water Conservation in the Kingdom, Dhahran 23-25 April.
Kelton , W. , R . Sodowski and N. Swets .2006. Simulation with Arena. McGraw-Hill ,5th Edition
Leedy, P.D, and J.E. Ormrod .2005. Practical Research, Planning and Design. Eighth Edition, Upper Saddle River, NJ: Pearson/Prentice Hall
Little A. W. & A. Green .2009. Successful globalization, education and sustainable development . International Journal of Educational Development 29 : 166–174
Luo ,C. , N. Zhang , N. Lior and H. Lin.2011. Proposal and analysis of a dual-purpose system integrating a chemically recuperated gas turbine cycle with thermal seawater desalination. Energy 36 : 3791-3803.
Mussati,S. , P. Aguirre and N. Scenna .2002. Dual-purpose desalination plants. Part II. Optimal configuration. Desalination 153 : 185–189
Uche , J. , L. Serra and A. Valero .2001.Thermoeconomic optimization of a dual-purpose power and desalination plant. Desalination 136 : 147-158.
How to cite this article
Diab, L.M. and Musharavati, F. (2012). 'Simulation Modeling and Analysis of Water/Power Ratios for a Dual Purpose Water and Power Production Plant'. SET Proceedings, 11(1), pp. 1530-1540. https://doi.org/10.65582/set.2012.158