The electrification of building heating is an effective way to meet the global carbon target. As a clean and sustainable electrified heating technology, air-source heat pumps (ASHPs) are widely used in areas lacking central heating. As a major component of heating systems, heating terminals have great effect on both intermittency and flexibility of the system. In this study, an integrated dynamic model was developed by considering the interaction of thermal processes among building envelopes, terminals, and heat pumps. The radiant heat transfer ratio of the heating terminal, which was introduced in the dynamic thermal balance equations, was a key parameter to describe the characteristic of heat transfer between the terminal and the building. Field tests demonstrated that the simulated results were closer to the tested values when considering the proposed ratio. An intermittent heating control strategy as well as demand response operation were applied to heat pump heating systems respectively. The effect of different terminals on room temperature response speed, energy saving rate, load shifting rate and load shifting efficiency was analysed. The results indicated that heat pumps under intermittent heating were more efficient in buildings with convective heating terminals. Specifically, fan-coil heating systems could use 16.48% less energy, while radiant floor heating systems consumed more energy under intermittent heating. For buildings with convective terminals (such as fan coils), the warm-up time was 0.09 h to 0.33 h, and for those with convective-radiative terminals (such as radiators), the warm-up time was 0.23 h to 4 h under daily intermittent heating, while there was nearly no need to preheat in buildings with radiative terminals (such as radiant floors). On the other hand, the buildings with radiative heating terminals had better flexibility potential. By adopting the model predictive control strategy, the load shifting ratio of radiator heating systems was about 2.9 times that of fan coil heating systems. Finally, an idea of a novel radiation-adjustable heating terminal was proposed in order to achieve both intermittency and flexibility.
Keywords. Heating terminal; Radiant heat transfer ratio; Intermittent heating; Demand response; Load shifting ratio
References
Benakopoulos, T., Vergo, W., Tunzi, M. et al. (2022) ‘Energy and cost savings with continuous low temperature heating versus intermittent heating of an office building with district heating’, Energy, 252(8), 124071. Available at: https://doi.org/10.1016/j.energy.2022.124071
China Academy of Building Research (2015) Design standard for energy efficiency of public buildings (GB 50189-2015), Beijing.
Hong, T., Jiang, Y. (1997) ‘A new multizone model for the simulation of building thermal performance’, Building and Environment, 32(2), pp.123-128. Available at: https://doi.org/10.1016/S0360-1323(96)00045-5
Hu, C., Xu, R., and Meng, X. (2022) ‘A systemic review to improve the intermittent operation efficiency of air-conditioning and heating system’, Journal of Building Engineering, 60(11), 105136. Available at: https://doi.org/10.1016/j.jobe.2022.105136
Wang, Z., Lin, B., and Zhu, Y. (2015) ‘Modeling and measurement study on an intermittent heating system of a residence in Cambridgeshire’, Building and Environment, 92(5), pp.380-386. Available at: http://dx.doi.org/10.1016/j.buildenv.2015.05.014
Wu, Y., Sun, H., Duan, M. et al. (2023) ‘Novel radiation-adjustable heating terminal based on flat heat pipe combined with air source heat pump’, Engineering, 20 (1), pp. 192-207. Available at: https://doi.org/10.1016/j.eng.2021.09.019
Xu, B., Zhou, S., and Hu, W. (2017) ‘An intermittent heating strategy by predicting warm-up time for office buildings in Beijing’, Energy and Buildings, 155(8), pp.35-42. Available at: http://dx.doi.org/10.1016/j.enbuild.2017.08.062
Xu, B., Fu, L., and Di, H. (2008) ‘Dynamic simulation of space heating systems with radiators controlled by TRVs in buildings’, Energy and Buildings, 40(3), pp.1755-1764. Available at: http://dx.doi.org/10.1016/j.enbuild.2008.03.004
Xu, B., Zhou, S., and Hu, W. (2017) ‘An intermittent heating strategy by predicting warm-up time for office buildings in Beijing’, Energy and Building, 55(8), pp.35-42. Available at: http://dx.doi.org/10.1016/j.enbuild.2017.08.062
Zhang, X., Chen, W., Yu, W. et al. (1994) ‘Experimental study on the proportion between the convection heat and radiation heat for commonly used radiators’, Heating Ventilation and Air Conditioning, 24(6), pp.13-15.
Zhang, Y., Yan, D., Hu, S. et al. (2019) ‘Modelling of energy consumption and carbon emission from the building construction sector in China, a process-based LCA approach’, Energy Policy, 134, 110949. Available at: https://doi.org/10.1016/j.enpol.2019.110949
How to cite this article
Xu, B., Li, Q., Dou, Y. and Yan, Y. (2023). 'The intermittency and flexibility of heating systems with different terminal types in buildings'. SET Proceedings, 20(1), pp. 169-178. https://doi.org/10.65582/set.2023.019