The article initially presents the implementation principle of a specific nuclear power Reactor Trip System and elaborates on the composition of the total response time calculation of the reactor protection system. In consideration of the requirements outlined in regular test supervision, it raises the issue of testing the total response time of the Reactor Trip System during unit overhaul in the commercial operation stage. Based on actual site conditions and combined with multi-plant and multi-equipment comparison, a representative test plan with implementable conditions is developed. The article introduces the specific implementation method and Theoretical optimization method for calculating response time.
Keywords. Safety DCS; RTS; Response Time; Calculation Method; Test Method
References
Heinz Prehler, 2006, TELEPERM XS system overview, AREVA NP, Inc.
Béla G. Lipták and Halit Eren, 2011, Instrument Engineers Handbook. New York: CRC Press. US
NRC, 1997, NUREG-0800.BTP7-21. Guidance on Digital Computer Real-Time Performance.
Yang LIU, 2020, A response time evaluation method of reactor protection system implemented by DCS, China Nuclear Power, Volume 13, 606-610.
Xuehui SUN, 2016, Analysis and test of response time of nuclear power plant digital control system to avalanche, Nuclear Science and Enginnering, Volume 36, 843-849.
Yong XU, 2017, Research of test scenario of T2 response time of reactor protection system, Nuclear Power Engineering, Volume 38, 116-119
Deying DONG, 2020, The design of automatic testing system for nuclear protection system response time, Nuclear Electronics & Detection Technology, Volume 40, 504-507
How to cite this article
Xie, Y., Yang, P. and Ma, X. (2024). 'Response time calculation and test optimization of reactor trip system'. SET Proceedings, 21(3), pp. 268-274. https://doi.org/10.65582/set.2024.132